Inspection
Field review of exposed exterior egress components, visible deterioration, access conditions, and documentation needs.
Boston Fire Escapes
Technical fire escape information, inspection support, repair planning, and documentation guidance for Boston and Massachusetts properties.
Schedule InspectionThe five-year inspection cycle is a compliance checkpoint for exterior egress structures. Owners need an inspection, clear findings, repair direction when deficiencies exist, and documentation that follows the current Boston process.
Code-aligned path
A clear Massachusetts / Boston workflow: inspect for safety, repair what fails, then document certification only when the fire escape can perform.
Send the address, access details, photos, and any notice or deadline.
The exterior egress system is reviewed as a life-safety structure under code—not only surface finish.
Deficiencies, photos, and required next steps are organized for ownership and compliance teams.
Unsafe steel, anchors, rails, treads, landings, and connections are scoped so the system can function.
Completed work is reviewed before certification documentation moves forward.
When the structure supports it, certification or affidavit documentation follows the current City and state process.
Protect people. Stay in code.
Schedule inspection, upload a notice, or request repair review. We align field safety with Massachusetts and City of Boston documentation requirements.